VIDEO & SOUND PRODUCTION - Project 2
23/10/19 – 30/10/19 (Week 5 – Week 6)
Arletta Leviani (0337751)
Video and Sound Production
Project 2
Lecture 6
1/10/19 (week 6)Today we are told to film a video based on a commercial, between 2, our group decided to pick the horror. Since our class are smaller, we decided to make the group from the whole class instead of dividing them to 2 groups.
Producer - Joe
Art Director - Zain
Assistant art director - Arletta
Director - Ryan
Assistant director - Ava
Actor - Qaezie/Zhang YiXiang
Camera - Ehti
Assistant camera - Melvin
Lighting - Jason/Ting
Sound - Alex/Nizam
Pre-production
This is some behind the scenes pictures of our filming day.
Fig 1.1 Behind the scene 1 |
Fig 1.2 Behind the scene 2 |
Fig 1.3 Behind the scene 3 |
Fig 1.4 Behind the scene 4 |
Post-production
This stage is when we do the color correcting, and audio editing. This is the progress picture of audio editing, reducing noise and putting footsteps.
Fig 1.1 Audio progression |
50 second video from 'good shot':
This is the final video recreating commercial:
Comments
Post a Comment